1,000.00

TSCR-BZA UPDATE

TSCR-BZA UPDATE

TSCR – THE SOUTH CENTRAL RAILWAYS, A REALISTIC ROUTE WITH REAL DISTANCE FROM SECUNDRABAD TO VIJAYWADA VIA GUNTUR 420KMS

 

UPDATE INCLUDES NEW SECTION –
➡️ Vijaywada new scenery 🌲
➡️ TENALI new scenery 🌲
➡️ NEW GUNTUR/REPALLE 🌲

KMS INFO-
GUNTUR – VIJAYWADA = 31KMS
TENALI – VIJAYWADA = 31KMS
TENALI – NEW GUNTUR = 25KMS
TENALI – REPALLE = 33KMS

Repalle,Tenali are complimentary with BZA update Not included in pricing the pricing is purely of GUNTUR TO VIJAYWADA

REQUIREMENTS 📥
➡️ 14GB Disk space
➡️ 7GB downloadable

Categories: ,
Report Abuse
Description

Description

TSCR-BZA UPDATE

TSCR – THE SOUTH CENTRAL RAILWAYS, A REALISTIC ROUTE WITH REAL DISTANCE FROM SECUNDRABAD TO VIJAYWADA VIA GUNTUR 420KMS

 

UPDATE INCLUDES NEW SECTION –
➡️ Vijaywada new scenery 🌲
➡️ TENALI new scenery 🌲
➡️ NEW GUNTUR/REPALLE 🌲

KMS INFO-
GUNTUR – VIJAYWADA = 31KMS
TENALI – VIJAYWADA = 31KMS
TENALI – NEW GUNTUR = 25KMS
TENALI – REPALLE = 33KMS

Repalle,Tenali are complimentary with BZA update Not included in pricing the pricing is purely of GUNTUR TO VIJAYWADA

REQUIREMENTS 📥
➡️ 14GB Disk space
➡️ 7GB downloadable

Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “TSCR-BZA UPDATE”

Your email address will not be published. Required fields are marked *

More Products
No product has been found!
Product Enquiry

Product Enquiry

Rules for MSTS Sellers

 

1. Do not upload the same product on mibproduction.in that is already listed on irts.in.

2. If you want to upload a product that is already on irts.in, you must first obtain permission from the owner of irts.in.

3. All product listings must adhere to these rules